Detailed Design And Construction Supervision For The Sungai Buloh River Improvement Works (Phase 1), Selangor, MALAYSIA

The main objective of the Project is to increase the flood protection level of the catchment and to control riverbank erosion. The main components of scope of works are summarized as below:

The detailed design works have been completed in early 2001 and the construction works anticipated to be completed by July 2004.

Page Links